Process
Five phases, and a night before anything else
A hotel is drawn in order. Skipping a step is always paid for, and it is paid at opening — that is, at the worst possible moment.
- 01
The night
I sleep on site, alone, for one night. If the building does not exist, I sleep in the closest equivalent. Four notebook pages the next morning. This phase is not invoiced: it decides whether I take the project.
- 02
Feasibility
What the building can give: a realistic key count, service areas, regulatory constraints, budget order of magnitude. A short, honest document — including when the answer is no.
- 03
Concept and preliminary design
The architectural approach, floor plans, the room mock-up drawn full size in the studio, the first physical model. Everything is decided here.
- 04
Detailed design and tender
Construction drawings, details, material specifications, contractor tendering and bid analysis. The most thankless phase, and the most profitable one for the client.
- 05
Site and opening
Weekly site supervision, handover, snagging, and commissioning with the operating team. I am there on opening day, always.