Martinet Hall retrofit in Prangins, retained riveted steel frame and rooflight

Nyon, Martinet district (VD) — 2024

Martinet Hall

A 1911 industrial hall becomes a neighbourhood hub

Floor area
4 200 m²
Construction cost
CHF 18,1 mio hors TVA
Client
City of Prangins
Scope
Full services + works coordination
Programme
Food hall, shared workshops, 300-seat venue, offices for local associations
Team
Atelier 372 (lead), Vialle structural engineers, Ingérop MEP, Acoustib
Certifications
Low-energy retrofit — 68% carbon avoided vs new build
Current phase
Handover and completion (53)

92% of the steel frame retained, ground de-paved, south façade opened to the street: the hall changed use without losing its identity.

Martinet Hall housed a wire-drawing workshop for sixty years, then twenty years of nothing at all. The structural survey revealed a riveted steel frame in excellent condition: the demolition assumed in the original brief became indefensible, both economically and environmentally.

A survey before a drawing

We started with a full 3D scan and eight foundation investigations. The digital model built from the point cloud became the basis for every study: it is what proved the frame could carry the new insulated roof without heavy strengthening.

A box inside the box

The heated parts of the brief — the 300-seat venue, workshops and offices — are gathered into two timber volumes slotted under the frame. The rest of the hall remains a tempered, covered, generous space that hosts the market three mornings a week.

Project figures

1,340 tonnes of structure retained, 68% carbon avoided compared with an equivalent new build, 22 months on site with the building partly occupied.

We were asked for a demolish-and-rebuild scheme. We handed back a set of calculations proving the opposite. Camille Rosset, founding partner
FILM The project in motion No sound — 15 s
IMG Project images Click to enlarge
Covered market under the retained steel frame of Martinet Hall
Inserted timber volume housing the 300-seat venue
Long section showing the timber box under the existing frame
→ Next projects

Back to projects →

A GoodWebsites demonstration

Do you like this website? It could be yours.

ATELIER 372 does not exist. The website does: films, portfolio, insights, careers, a complete English version and a business-tracking back office. Every line was written from scratch, with no off-the-shelf template. We build the same for your practice, with your projects.