Gland Campus
Gland (VD)
Rolle (VD) — 2026
Retrofit of a 1907 thermal establishment
Original mosaics removed, restored and relaid; entirely new services threaded through the 1907 technical channels.
Currently on site. The difficulty here is not architectural but hydraulic: the spring has fed the pools by gravity since 1907, and current health regulations require treatment that the original pipework cannot accommodate.
The glazed roof, 640 sqm of mosaics, the original laminated timber frame and the main staircase. Everything else is removed, sorted and partly reused on site.
Tender documents issued in May 2026, opening planned for spring 2028.
The spring has been flowing by gravity since 1907. Our job is not to interrupt it. Marc Aubertin, construction director
Gland (VD)
Nyon, Martinet district (VD)
A GoodWebsites demonstration
ATELIER 372 does not exist. The website does: films, portfolio, insights, careers, a complete English version and a business-tracking back office. Every line was written from scratch, with no off-the-shelf template. We build the same for your practice, with your projects.