Rolle Thermal Baths
Rolle (VD)
Signy-Avenex (VD) — 2021
12 classrooms, a de-paved playground, not one corridor
Circulation became usable space. Each classroom opens straight onto a planted covered area used for teaching eight months a year.
The brief called for 320 sqm of corridors. We removed them in favour of covered outdoor galleries, working carefully on acoustics and wind protection. The floor area saved paid for the wood-fibre insulation and the open-ground playground.
1,400 sqm of asphalt removed, 38 trees planted, an infiltration swale that handles a full ten-year storm. Surface temperature measured in July 2025 is 14 °C lower than in the old playground.
A post-occupancy visit was carried out two years after opening with the teaching staff. Three lessons were fed straight into our following school projects.
Three hundred and twenty square metres of corridors removed paid for the bio-based insulation. Thomas Vercel, construction economics
Rolle (VD)
Gland (VD)
A GoodWebsites demonstration
ATELIER 372 does not exist. The website does: films, portfolio, insights, careers, a complete English version and a business-tracking back office. Every line was written from scratch, with no off-the-shelf template. We build the same for your practice, with your projects.